Sustainability & Efficiency
Current Industry Problems
- Unsustainable concrete footings and heavy kentledge heavily contribute to the projects carbon footprint
- Concrete contaminants pollute the ground and negatively impact the local environment, wildlife, natural watercourses and tree root systems
- Concrete footings offer a 1 time use and are often cut and left in situ following the hoarding is removed
- Bulky and heavy kentledge are difficult to transport and manual handling contributing to higher pollution from required vehicle movement
- Installing concrete blocks or kentledge weights is labour intensive and time consuming. The need for heavy lifting equipment adds to both setup and teardown times, reducing overall efficiency
Fence-Lok Solutions
- Sustainable Solutions
- Recyclable materials and reusable systems
- No Concrete contaminants or one time use materials
- Reduced transportation carbon footprint
- All systems are TPO and RPA Compliant
- Rapid deployment and simple installation process
- Lightweight and compact products for easy storage
Safety & Security
Current Industry Problems
- Heavy kentledge significantly increases manual handling risks and injuries
- Trip hazards are common place with traditional methods with high risk of trips and falls to the public
- Minimal use of anti-lift features
Fence-Lok Solutions
- Lightweight products to reduce manual handling
- Zero trip hazard on public side
- Anchor and locked with anti lift measures
- Certified high wind load resistance to prevent blown over temporary fencing
- Heavy duty Hoarding designs
COST
Current Industry Problems
- High Installation costs due to inefficiently and labour expensive installation
- High transportation and on-site powered machinery handling costs
Fence-Lok Solutions
- Quick installation with lower installation costs
- Lower transportation costs due to compact and lightweight products
- Handheld install machinery options including electrical battery
Design Compliance
Current Industry Problems
- Majority of sites are not Temporary Works compliant and do not have the stability in place for its local wind and site conditions
- Use of ‘standard’ temporary fencing and hoarding designs which do not consider site specific factors or excessive kentledge or concrete footings which dramatically increase project costs
Fence-Lok Solutions
- Site Specific Temporary Works Package including Wind Load Calculation, Design + Certification, On-Site Anchor Load Testing with Report and System Drawing
- Fit for purpose solutions with site factors and environment considered
OUR SOLUTIONS
Open Mesh Temporary Fencing
Standard, Debris Netting or Acoustic Barriers
Rigid V-Mesh Temporary Fencing
Standard, Debris Netting or Acoustic Barriers
Solid Hoarding
Recycled Plastic, Steel and Timber
Tree Preservation Fencing
All solutions or Impact Resistant Open Mesh Barrier